Minnesota Boiler Department

State of Minnesota Chief
Joel T. Amato, Chief Boiler Inspector
Minnesota Department of Labor and Industry
Code Administration and Inspection Services
Boiler Division
443 Lafayette Road St. Paul , Minnesota 55155-4304
United States
Phone: 651.284.5137
FAX: 651.284.5737
Email: joel.amato@state.mn.us
| Recently I have had many requests for the dates when certain codes were adopted and became effective.
I have attached a document that lists several dates when codes where adopted and when certain requirements of
those codes became effective.
I have also had several phone calls regarding the website and the lack of searchable information.
We have switched over to our new computer system and the tables have not been created to allow inspectors to
search for specific things like MNB#. This will be resolved by July 1, 2010.
We plan on building a search
engine with the same fields as the previous one. If you have any other searchable fields you would like added
to this please let me know prior to April 30, 2010.
One other favor I would like to ask of you………………
We recently switched to a new email system (Outlook) and somehow in the process I lost my address book with all the inspector contacts, so if you know of someone who did not receive this email from me that should, please send me their email address.
Thank you,
Joel T. Amato
Chief Boiler Inspector
Minnesota Department of Labor and Industry
Office 651-284-5137
Cell 651-303-2758
|

Code Adoption Effective Dates
- 1881, State Boiler Inspection Division formed
- ASME Code first edition in 1914
- National Board Inspection Code published in 1946
- 1957- American Society of Mechanical Engineers Code (ASME)
- 1982- National Board Inspection Code (NBIC)
- 1984- ASME Code – Controls and Safety Devices for Automatically Fired Boilers (CSD-1)
- CW-120 (a, b) (Low Pressure Steam Vapor, pumped condensate return) Primary and Secondary Low Water cut-Out required. Secondary must have manual reset.
- CW-130 (d, e) (Hot Water Heating Boiler) Low Water Cut-out with manual test and reset
- CW-140 (a, b) (High Pressure Steam Vapor) Primary and Secondary Low Water cut-Out required. Secondary must have manual reset.
- CW-410 (c) High Temperature Limit with manual reset on each Hot Water Heating Boiler
- 1993- Emerg/Remote Shutdown outside of boiler room required.
- 1994- National Board Registration Required
|
|